Services

Construction Managers

buy amoxicillin over the counter

buy amoxicillin for dogs uk website amoxicillin without prescription

prednisolone cost

buy prednisolone redirect prednisolone online

clomid birmingham

clomid uk sale nguoiviendong.net clomid uk success rates

tamoxifen davis pdf

tamoxifen

clomid birmingham

clomid online

accutane without gelatin

buy accutane 10mg uk blog.endungen.de accutane without gelatin

buy clomid pct

clomid london drugs francescocutolo.it clomid uk success rates

Amoxicillin 500 mg Capsules

amoxicillin without prescription blog.keylink.rs amoxicillin 500mg

buy antibiotic online

buy amoxicillin

Amoxicillin 500 mg Capsules

buy amoxicillin for dogs uk online amoxicillin over the counter

buy amoxicillin canada

amoxicillin cost without prescription

buy naltrexone from trusted pharmacy

buy naltrexone online usa blog.sportsonline.com.au buy naltrexone online usa

antidepressant sertraline

buy sertraline website-knowledge.com antidepressant sertraline

cheap sertraline

buy sertraline uk click here sertraline without prescription

As your Construction Manager, Hayek Group will act as your agent throughout the design and construction phases of your building project, until the day when the lights are turned on in your new building for the very first time. HG will manage details including coordinating with Architects to keep project costs down, working to maintain project schedule, processing pay applications, and expediting Owner occupancy thus permitting through local agencies.

The following are the major services HG will provide during the design and construction phases:

Pre-Design / Concept Phase

Program Needs Assessment
Program Budget Confirmation
Cash Flow Projection
Community Attitude Survey
Dialogue Meetings and Bond Campaign

Bid Phase

Scheduling
Bid Packaging
Bid Document Preparation
Bid Solicitation
Bid Review / Recommendation
Contract Preparation

Design Phase

Scheduling
Estimating
Value Engineering
Constructability Review
Program Compliance Review
Utility Company Coordination
Permit Process Management

Construction Phase

Scheduling
Complete Contract Administration
Contractor Coordination
 Quality Control
Cost Reporting

Post-Construction / Project Close Out

Final Inspections / Occupancy Permit
Owner Move-In Coordination
Staff Training Coordination
Punchlist Completion
Contract Closeout

Facility Assessments

It is sometimes necessary to evaluate the condition and life expectancy of an existing facility. Whether as condition of sale or to determine the value of the facility for consideration of future renovations or additions, Hayek Group s.a.r.l can assist with this important service. Our staff of professionals can help evaluate the condition of all elements of an existing facility.

Owner's Representations

naltrexone for alcoholism

buy naltrexone uk

tamoxifen citrate

tamoxifen uk side effects website tamoxifen uk price

buy clomid uk

clomid uk to buy

abortion pill usa legal uk

abortion pill online

albuterol inhaler for cough

buy albuterol sulfate

abortion pill

purchase abortion pill online uk click here name of abortion pill in uk

naltrexone where to buy

buy low dose naltrexone canada click buy naltrexone online cheap

buy amoxicillin australia

buy amoxicillin

buy accutane pills

buy accutane pills

buy amitriptyline online

buy antidepressants visa read amitriptyline and tinnitus

buy antidepressant

buy amitriptyline

How to Take Amoxicillin

buy amoxicillin-clavulanate

abortion pill usa legal uk

order abortion pill online uk online buy abortion pill online

antidepressant sertraline

buy sertraline online read here antidepressant sertraline

buy abortion pill philippines

abortion pill philippines

pills for abortion

buy abortion pill

Hayek Group‘s Owner’s Representative (Owner’s Rep) Services are similar to our Construction Management Services. Design phase services are identical, yet construction phase services can be tailored to protect Owner interest while minimizing attendant fees.

Hayek Group‘s Owner’s Representative (Owner’s Rep) Services are similar to our Construction Management Services. Design phase services are identical, yet construction phase services can be tailored to protect Owner interest while minimizing attendant fees.

In general, there are three elements in executing a construction project – whichever method of project delivery:

  1. Contract administration
  2. Construction coordination
  3. Project controls

HG services include contract administration, construction coordination, and project controls, while the Owner’s Rep services solely involve project controls and will supervise, scrutinize construction activities and report back to the Owner with project updates. This requires one person on the project site full or part time. A Construction Manager needs one or two other support staff to process all of the construction administration and coordination.

Owners use our Owner’s Rep service for several reasons. A General Contractor can provide the contract administration such as processing paperwork and Contractor pay applications. it is optimal to use an Owner’s Rep in the following circumstances:

  • You have decided on using the General Contractor or Multiple Prime Contractor method and you want a person on site to act as your “eyes and ears.”
  • You want an experienced construction professional to manage the construction of your facility.

Value Engineering

tamoxifen uk price

tamoxifen shortage uk dogancoruh.com tamoxifen moa

buy amitriptyline

buy amitriptyline

prednisolone cost

buy prednisolone click here cheap prednisolone

amitriptyline 50mg

amitriptyline online

buy prednisolone 5mg tablets uk

cheap prednisolone blog.structuretoobig.com cheap prednisolone

amoxicillin 500mg

amoxicillin uk

amoxicillin 500mg

buy amoxicillin over the counter francescocutolo.it buy amoxicillin uk

generic albuterol vs ventolin

albuterol vs ventolin

buy prednisolone 5mg

buy prednisolone eye drops over the counter blogs1.welch.jhmi.edu prednisolone london

order abortion pill online

abortion pill online

naltrexone buy online canada

where can i buy low dose naltrexone open buy naltrexone from trusted pharmacy

nerve pain in leg amitriptyline

nerve pain in arm amitriptyline link nerve pain in tooth amitriptyline

buy naltrexone

buy naltrexone uk

buy amoxicillin for dogs uk

buy amoxicillin australia read here how to take amoxicillin

abortion pill online

abortion pill online williamgonzalez.me name of abortion pill in u

where can i buy low dose naltrexone

buy naltrexone online india jlopresti.fr buy generic naltrexone online

If the facility budget is not met, Hayek Group will propose value engineering (VE) alternatives. VE is the systematic analysis and exploration of options to stay on budget or save costs. The ultimate objective of VE is to preserve the look and function of the project, while finding alternatives to lower the cost.

Although VE can save clients substantial amounts, it is much more than a simple cost-cutting exercise. When a VE session is conducted, we will evaluate, at a minimum, first cost, schedule impacts, constructability issues, and life-cycle costs including capital, operating, maintenance, energy systems, financing, ownership structure, and tax laws. The exercise may result in increased first costs; however, the overall impact will minimize the total life-cycle costs during the functional life of the facility.

Systems analysis is at the center of the overall VE effort. Typical systems include site work, foundations, structural, architectural, mechanical, electrical, and exterior enclosure. During the systems review, we will make recommendations, which focus on construction feasibility, availability of materials/labor, installation time, associated costs/economies, and the impact on other building components.

For each project, a VE team will be established to include the Owner, Architect/Engineer, and the Construction Manager. HG’s experience with VE has shown that the best results occur during the Design Development phase. The team meets at pre-determined intervals to identify alternative materials, methods of construction, and issues affecting the schedule and operations.

Each item is evaluated and either accepted or rejected depending on the total impact on cost, function, program, schedule, and overall needs.

Cost Estimating

buy clomid bodybuilding

clomid online reviews

tamoxifen uk price

tamoxifen

clomid online reviews

buy clomid uk

buy tamoxifen ireland

tamoxifen

order naltrexone pills

alcoholism treatment uk

accutane without side effects

buy accutane pills click buy accutane singapore

prednisolone london

buy prednisolone 25mg tablets go buy prednisolone for dogs

tamoxifen davis pdf

tamoxifen mechanism of action charamin.jp tamoxifen citrate

accutane without insurance

accutane without food open accutane without birth control

accutane without insurance reddit

buy accutane pills

tamoxifen mechanism of action

buy tamoxifen citrate uk

Buy Amoxicillin uk

buy amoxicillin amazon

prednisolone pharmacy

prednisolone online

get naltrexone pills

buy naltrexone uk

lyrica online canada

buy lyrica online

buy amoxicillin over the counter

buy antibiotic online by-expression.com buy amoxicillin for dogs uk

name of abortion pill in uk

abortion pill online

abortion pill london

abortion pill uk meteo.marche.it abortion pill uk

antidepressant online delivery

buy sertraline

Amitriptyline for Anxiety

buy antidepressant blog.pragmos.it buy antidepressants visa

One of our greatest proficiencies is cost estimating. HG has developed over $150 million of construction project cost estimates. As an independent service, we provide in-house architectural, civil, structural, mechanical, electrical, plumbing, fire protection, and technology cost estimating to Owners and architectural firms. This service is of value to the Owner since in-house capabilities eliminate any perceived conflict of interest between the project team and any future bidders. It is also of particular significance when the Value Engineering process is undertaken because of our first-hand knowledge of all aspects of the building construction.

Accurate and well-defined cost estimates are critical to the success of every project. HG’ estimators specialize in providing accurate construction cost estimates from the initial programming phase through the detailed design and construction phases. Our cost estimating procedures are designed to ensure that each element of the project is well defined and accounted for in the estimate format.

Our cost estimating efforts begin with the Program Level estimates of the proposed program. These estimates serve as our “Cost Models” for the project and will be updated to reflect the additional information and details included on the Schematic, Design Development, and Construction Documents. We work with the Architect and the Owner throughout the design phase to ensure design components align with available funds. Our final cost estimate, prior to bidding, is used to evaluate the competitive bids received for the various elements of work. This continuous estimating process works to avoid possible bid day disappointment of high bid prices and insures that on bid day the project is within budget.

Architectural / Civil / Structural Cost Estimating
HG will work with the Architect to establish appropriate bid alternatives to maximize the design features included in each project while maintaining costs within the budget. HG accounts for site development, utilities, structural systems, exterior envelope systems, finish systems such as floors and doors, and equipment specialties. We prefer to develop the project estimate in “Building Component Format,” i.e. foundations, structure, exterior walls, finish trades, etc., which facilitates making comparisons and developing alternative solutions. This “monitorable” format provides a means of creating an audit trail from the initial estimate to the project’s completion.


Mechanical / Electrical / Plumbing Cost Estimating
Our staff also understands the M/E/P systems common to various facilities and will work with the engineers to evaluate different systems and cost models. All estimates are developed in a material and labor format, which enables HG and the Owner to perform comprehensive bid evaluations and change order reviews.

Scheduling

buy clomid pct

buy clomid tablets

buy naltrexone uk

buy naltrexone uk

accutane without birth control

accutane acne marcelosincic.com.br accutane without food

clomid london

buy clomid tablets

clomid uk buy online

clomid online

tamoxifen 20 online

tamoxifen shortage uk website-knowledge.com tamoxifen citrate 20mg online

buy accutane malaysia

cheap accutane click here accutane without gelatin

Amoxicillin 500 mg Capsules

buy amoxicillin australia meteo.marche.it buy amoxicillin for dogs uk

amitriptyline pain reddit

amitriptyline pain dosage

amitriptyline painkillers

nerve pain amitriptyline

naltrexone for alcoholism

buy naltrexone uk

buy antidepressants

buy amitriptyline

Design Phase Schedule During the design phase of a project, critical baseline decisions relating to budget, form, and function are made. Although the objectives of a project may be clearly established at the outset (i.e. occupancy date, budget, level of quality, etc.), the means for achieving these results are often vague.

The schedule, created in-house using most up-to-date scheduling software, is monitored throughout the design phase to ensure that critical decision and design milestones are met. Progress is discussed at each team meeting and alterations to the schedule are made if major changes in scope occur or if tasks are not completed as originally planned.
In considering the schedule, elements are reviewed with respect to their impact on the sequence of construction, fabrication and delivery schedules, and the anticipated influence of weather during construction.

Using the project schedule and budget, HG can establish a preliminary cash flow projection of the required project funds. These costs are the Construction Manager (CM) fee, Architect fee, and estimates of construction labor and materials. This cost is dispersed over the scheduled project period. The Owner will then have a plan for monthly project expenditures.

Construction Phase Schedule

As the design continues to develop, so does the detailed master construction schedule. This schedule, which highlights activity periods for major subcontracts and material deliveries, may be included in the bid documents as a guide to the Contractors when establishing their proposals.

With the Owner’s input, we will prepare the construction schedule and monitor daily construction progress and procedures established by the Contractors and make recommendations as required maintaining or improving construction progress.

Building Information Modeling

prednisolone london

buy prednisolone

prednisolone dosage

prednisolone online click buy prednisolone eye drops over the counter

buy clomid uk

buy clomid tablets

buy prednisolone 5mg uk

buy prednisolone

prednisolone online

buy prednisolone

accutane without insurance reddit

accutane without dermatologist

amoxicillin uk

buy amoxicillin for dogs uk

How to Take Amoxicillin

buy amoxicillin

name of abortion pill in uk

abortion pill online blog.meyerproducts.com name of abortion pill in uk

buy naltrexone online

buy naltrexone online

misoprostol philippines

abortion pill philippines

buy albuterol sulfate inhalation solution

buy albuterol sulfate read here buy albuterol online

pregnant coronavirus us

pregnant coronavirus us kristinasmith.us coronavirus pregnancy nhs

lyrica online coupon

lyrica prescription information

buy low dose naltrexone

buy naltrexone without prescription open buy naltrexone no prescription

pregnancy termination in manila

order abortion pill philippines click here medical abortion ph

buy accutane singapore

buy accutane online

where to buy abortion pill uk

buy abortion pill online website abortion pill over the counter uk

abortion pill usa legal uk

usa buy abortion pill

where to buy low dose naltrexone

where can i buy naltrexone read here where to buy low dose naltrexone

Building Information Modeling (BIM) is the process of generating and managing building data during its life cycle. Typically it uses three-dimensional, real-time, dynamic building modeling software to increase productivity in building design and construction. The process produces the Building Information Model (also abbreviated BIM), which encompasses building geometry, spatial relationships, geographic information, and quantities and properties of building components.

HG embraces BIM as a core best practice for ensuring the very highest return on investment for its clients over the entire lifetime of a facility, continuing to pay dividends long after the last milestone in design and construction phases have been completed.

BIM offers several key benefits:

1.      Improved visualization

2.      Improved productivity due to easy retrieval of information

3.      Increased coordination of construction documents

4.      Embedding and linking of vital information such as vendors for specific materials, location of details and quantities required for estimation and tendering

5.      Increased speed of delivery

6.      Reduced costs